DELIVERY INSPECTION
Embroidery machine unboxing and inspection checklist
Quick Answer
Record package condition and count before opening, then follow the actual packing and handling instructions. Compare each item with the order and inspect for damage before setup. Keep a damaged or uncertain machine out of operation. Startup can cause motion, so it belongs after the required installation checks, not automatically at the crate.
Prepare before the crate arrives
Have the order and packing information, planned unloading route and rated handling arrangement ready. Identify the people permitted to unpack and move the actual machine.
Find the seller, carrier and insurance reporting procedures before delivery. Their notice and claim deadlines can differ. Prompt inspection helps preserve evidence; it does not replace each required notification.
Record the packed condition
From safe accessible positions, photograph the package, identifying labels and visible damage before opening. Note package count and the condition of any indicators fitted. Indicator results are individual observations, not complete damage diagnoses.
Record specific defects on delivery paperwork where applicable and keep a copy. Follow the separate reporting steps for formal claims. Delivery notes alone may not meet those requirements. See receiving inspections and damage claims for the handover and reporting record.
Open by the actual packing method
Use the opening sequence and restraint instructions supplied for the packing. Keep restraints in place until the documented stage for releasing them.
Use suitable tools without driving them into hidden machine parts. Secure removed panels, sharp fasteners and bands away from people and the handling route. Photograph the opening stages and retain required packing.
Do not pull the machine out before its supports and restraints are understood. Use the handling and installation plan for the actual machine. Head count alone does not determine when supports or restraints can be removed.
Count each item
Use the packing list for the actual order and compare it with the agreed purchase. Check individual sizes and quantities, not only the presence of an accessory box.
Look in the intended accessory containers before reporting a shortage. Do not dismantle equipment to search for missing items. Record wrong, damaged or missing goods by exact identity and keep the relevant photos.
Record machine model, serial number and delivery date securely. Use those identifiers for setup and support without exposing personal address labels in public photos.
Inspect before electrical connection
Look for visible impact damage, bent supports, damaged controls or cables, loose parts and moisture. Open only areas permitted for that inspection. Do not force mechanisms, tilt the machine or reach into an unstable load.
Do not energize equipment with suspected mechanical or electrical damage. Report the findings and obtain the appropriate assessment and release instructions.
Handle transport locks and ties through the actual model procedure. Some restraints are removed only after the machine is supported correctly. Do not cut every marked tie simply because it looks temporary.
Move startup to the correct stage
Power connection follows the required support, restraint, electrical and clearance checks. Startup may home or move the carriage. No sewing command does not mean no movement.
Use the approved startup sequence and keep people and tools clear. Record alarms exactly and stop for an unexplained problem. Screen startup does not prove the machine is undamaged or establish when hidden faults began.
Keep first sewing tests and complete configuration acceptance separate from the unpacking checklist.
Keep one inspection record
| Record | Purpose |
|---|---|
| Receipt and package photos | Handover condition and package identity |
| Packing list and actual contents | Quantity and configuration comparison |
| Machine identity | Connect findings to the actual unit |
| Defect photos and notes | Specific observed problem and date |
| Notifications and case reference | Show who received which report |
| Release and later test record | Distinguish inspection, setup and functional results |
Keep packaging through any required inspection or claim instructions. Do not discard it solely because the first test sewed.
Frequently asked questions
Does successful startup finish inspection?
No. It records only the tested startup condition. Contents, hidden damage, installation and the broader machine functions still have their own checks.
Must I unpack the same day?
Arrange prompt safe inspection and meet actual deadlines. Do not rush unsafe lifting or assume one same day photo meets every reporting requirement.
Should I remove a shipping lock I cannot identify?
No. Resolve its purpose and removal stage from the actual instructions. Guessing can release a supported part or leave a transport restraint in a moving mechanism.
What if a part is missing?
Record the exact part, expected source and actual contents, then report through the correct seller or claim route. Keep the installation at a safe stopping point until essential items are resolved.